The OeS program is used to calculate power networks in operating and short-circuit conditions. The program is intended for calculations in radial and multiply closed electrical networks. The program’s computational capabilities allow for the analysis of the operation of HV, MV and LV networks. The program is also equipped with modules supporting the selection of protection settings and determining the load capacity depending on the installation conditions.
Overhead lines
The ZikOS program is used for a comprehensive analysis of the operating states of overhead power lines. TheZikOSsystem enables the analysis of cable mechanics, electrical parameters of the line and the line’s impact on the environment. The developed solutions enable advanced analysis of the current line condition, effective design of new and modernized lines, and effective assessment of environmental threats related to their operation.